Project

CRIMSCOTT STREET, BERMONDSEY, LONDON

Client: City Inc

Main Contractor: QBRE Ltd

Project completion date: October 2022

Project value: £61,000

Project type: Staircase

Projects  >  Crimscott Street

Details of the Design

2 flight straight staircase with floor edge glass balustrade and stainless steel handrail.

Who is the user?

Commercial shared office space.

Constraints / challenges?

This was a typical project for the Elite Metal Group. The contractor was working against extremely tight timescales as the shared office space had clients waiting to move in.

We were able to liaise with the Main Contractor to work alongside teams already working on site to install the staircase without disrupting work schedules or causing any unnecessary delays.

Fabrication Detail:

This industrial staircase was made
of mild steel with double stringers
and an integrated glass track system
to accept a 17.5mm thick clear,
toughened and laminated glass
balustrade. To complete the look,
steel treads were incorporated and a
striking stainless steel handrail made
from 42mm tubes added.

Installation Detail:

The Elite Metal Group were proud
to manage every aspect of this
staircase from concept design,
project management, manufacturing,
transporting and installation using our
own in-house experienced Teams.

Why was the Elite Metal Group chosen for this project?

This is the first time that we have worked with City Inc. and we’re pleased that they decided to call upon our 70+ years of staircase expertise for this memorable staircase, that is the focal point of a new creative shared work space in central London. It was a pleasure working along the City Inc. Team who genuinely wanted to understand the design rationale and installation process. We look forward to working alongside them again on future projects.

The Finished project

The Elite Metal Group completed this staircase on time and for the agreed budget. The staircase is without doubt the heart of the building and a memorable addition to this commercial space. The office space now has a strong industrial feel with modern undertones which works well for the digital website teams who will soon be moving in and calling this space their office.

If you’re in need of design inspiration on your staircase project, don’t hesitate to call us – just as City Inc. did for this project.

CrimScott Street, Bermondsey, London

Why work with us?

70 years of experience

Elite Metal Group has been manufacturing for over 70 years.

In-house manufacturer

Our 44,000 square foot factory in west London means our location is perfect for your project requirements

Minimal lead times

By manufacturing in-house we can ensure that we meet every agreed project deadline with no delays

No third parties

Our in-house teams can survey, design, manufacture, deliver and install.

44,000 ft2 factory

Our factory in west London means our location is perfect for your project requirements

Dedicated delivery fleet

Elite MEtal Group has it’s own in-house delivery and experienced installation Teams

The Group Benefits

Our group buying power means that you can enjoy competitive rates whilst enjoying the best quality in the business.

Accredited

We’re accredited by CHAS, Constructionline, BALI, FORS, CE Marking, Safe Contractor and more.